Monday, December 10, 2018
Redactor's Choice
You are here: Home / Categories / Business & Entrepreneurship / LUKOIL COMPLETES WELL SIX AND BEGINS DRILLING WELL SEVEN AT FILANOVSKY FIELD
LUKOIL COMPLETES WELL SIX AND BEGINS DRILLING WELL SEVEN AT FILANOVSKY FIELD

LUKOIL COMPLETES WELL SIX AND BEGINS DRILLING WELL SEVEN AT FILANOVSKY FIELD

  • International
  • LUKOIL has completed construction of the sixth well, a water injector, at Vladimir Filanovsky field in the Caspian Sea and started to drill the seventh, a horizontal one, also a water injector. The first five wells, completed earlier, are producers.
  • LUKOIL
  • info@lukoil.com

At the same time, the company is mounting the topside of the accommodation block on the substructure as part of V. Filanovsky field Phase 2 development plan. The topside of the fixed offshore ice-resistant platform was installed earlier, in April.

 

It is expected that the Phase 2 construction and assembly operations will have been completed by the end of 2017. The average daily production exceeded 14 thousand tonnes of oil, as in June of 2017.

 

About Chief Editor

Chief content editor of PressCenter website.

Leave a Comment

Required fields are marked with *

*

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Select the person with
the raised up hand *

Scroll To Top